GMAT
Highway Official: When resurfacing our concrete bridges, we should use electrically conductive concrete (ECC) rather than standard concrete. In the winter, ECC can be heated by passing an electric current through it, thereby preventing ice buildup. The cost of the electricity needed is substantially lower than the cost of the deicing salt we currently use. Taxpayer: But ECC is vastly more expensive than standard concrete, so your proposal is probably not justifiable on economic grounds. Which of the following, if true, could best be used by the highway official to support the official's proposal in the face of the taxpayer's objection?
【选项】The use of deicing salt causes corrosion of reinforcing steel in concrete bridge decks and damage to the concrete itself, thereby considerably shortening the useful life of concrete bridges.
题目基本信息