GMAT
There were concerns about public health leading to the construction between 1876 and 1904 of three separate sewer systems serving metropolitan Boston.
Concerns about public health led to the construction between 1876 and 1904 of three separate sewer systems to serve metropolitan Boston.
题目基本信息