Each Type A machine fills 400 cans per minute, each Type B machine fills 600 cans per minute, and each Type C machine installs 2,400 lids per minute. A lid is installed on each can that is filled and on no can that is not filled. For a particular minute, what is the total number of machines working?
(1) A total of 4,800 cans are filled that minute.
(2) For that minute, there are 2 Type B machines working for every Type C machine working.