Highway Official: When resurfacing our concrete bridges, we should use electrically conductive concrete (ECC) rather than standard concrete. In the winter, ECC can be heated by passing an electric current through it, thereby preventing ice buildup. The cost of the electricity needed is substantially lower than the cost of the de-icing salt we currently use.Taxpayer: But construction costs for ECC are much higher than for standard concrete, so your proposal is probably not justifiable on economic grounds.Which of the following, if true, could best be used to support the highway official's proposal in the face of the taxpayer's objection?
【选项】The use of de-icing salt causes corrosion of the reinforcing steel in concrete bridge decks and damage to the concrete itself, thereby considerably shortening the useful life of concrete bridges.