GMAT 考满分题库

- 数学PS -
The time for machine A to produce 1000 sheets of paper is 1/2 of the time required for machine B to complete the same work. When machine A and machine B work at the same time, it takes 3 minutes to produce 1000 sheets of paper. If machine B works alone, how long does it take to produce 2000 sheets of paper?
  • A4.5
  • B9
  • C13.5
  • D18
  • E22.5
显示答案
正确答案: D

讨论题目 或 发起提问

|

题目讨论

  • 按热度
  • 按顺序

最新提问