Machine A produces nails at a uniform rate of 120 every 10 seconds, and Machine B produces nails at a uniform rate of 100 every 15 seconds. If the two machines run simultaneously, how many seconds will it take for them to produce a total of 140 nails?

  • A

    7.0

  • B

    7.5

  • C

    8.0

  • D

    8.5

  • E

    9.0

显示答案
正确答案: B